Human Resources
Police
Community Development
Fire
Light & Power
Admin
Environmental
Legal
Public Works
Finance
Parks & Recreation
Library

Problem Solver

Public Works Links

290 North 100 West
Logan, UT 84321
(435) 716-9152
Fax (435) 716-9001

24-Hour Customer Service
(435) 716-9090

Storm Water Hotline
(435) 716-9155

Public Works Department

PUBLIC WORKS DIRECTOR:
Mark Nielsen (435) 716-9151
 
Administrative Secretary:
Kim Nate (435) 716-9152
Duties:
  • Right-of-way Permits
   
Engineering Streets
Division Manager: Division Manager:
Bill Young, City Engineer Jed Al-Imari
Duties: Duties:
  • Inspections
  • Development Standards
  • Boundary Line Adjustments
  • Bids
  • Projects
  • Standards and Specs
  • Master Plan
  • Street Maintenance (asphalt repairs, street sweeping)
  • Snow Removal
  • Sign Maintenance (sign repair, sign replacement)
  • Paint Maintenance (pavement markings)
  • Concrete Maintenance (sidewalk, curb & gutter)
  • Grate & storm drain cleaning
For Questions contact: For Questions and Reporting call:
Brooke Talbot (435) 716-9153 Charon Sprague at (435) 716-9642
   
Water/Sewer Collection GIS (Maps)
Division Manager: Division Manager:
Paul Lindhardt Chuck Shaw
Duties: Duties:
  • Water Flow Issues
  • Leaks
  • Fire Hydrants
  • Meter Lids/Man hole Lids
  • Sewer Backup
  • Lateral location for both water and sewer
  • Manage Geographic Information Systems
  • GIS analysis
  • Train GPS and tablet users
  • Assess GIS needs and services
  • Manage orthophotography
  • Assign city addresses
  • Maintain GIS internet maps
For Questions and Reporting contact: For Questions contact:
Keri Moya (435) 716-9620 Lyle Shakespear (435) 716-9170
   
Facilities Shops
Division Manager: Fleet Manager:
Mike Miller (435) 716-9100 Marc Lee (435) 716-9660
Duties: Duties:
  • Keep buildings in working order
  • Keep equipment in good operating condition
  • Keep vehicles in good operating condition
Storm Water For Questions contact:
Storm Water Inspector Chanin Gammill (435) 716-9672
Kolby Christiansen (435) 716-9167  
Duties:
  • Storm water inspections
  • SWPPP reviews & questions
  • Illicit discharge detection and elimination
   
For Questions contact:
Brooke Talbot (435) 716-9153


News

2015 Spring Cleanup

The 2015 Spring Cleanup of yard waste will begin on Monday, April 13, 2015. Specifics on the program can be found on the Streets Department page.

1000 North 600 East Construction Closure

Update (3/26): The 1000 North 600 East intersection will remain closed through Friday morning. Please be aware of continuing traffic control changes.

Update (3/20): 1000 North 600 East construction is progressing quickly. The intersection will be closed from Tuesday morning through Thursday. Please be aware of frequent traffic control changes.

Construction on 1000 North 600 East will begin on Monday, March 16th. 600 East from 1000 North to 1100 North will be closed for approximately two weeks during the first phase. Construction is scheduled to be completed by June 1st.

Water Leak

Because of a water leak near the intersection of 100 North and Riverside Dr. we will be closing Riverside Drive, from Center Street to 100 North today. We hope to have the leak repaired by the end of the day, but we will know our schedule better once we have uncovered it completely and can see the precise location of the leak.

Center Street and 200 East Traffic Signal

Construction on the 200 East and Center Street traffic signal will begin on Monday, March 16th and will be complete on Friday, March 20th. Contact Tom Dickinson with any questions, 435-716-9168.

Steep Dugway Closed

The steep dugway connecting 600 East and Canyon Road will be closed today from 9 AM - 2 PM for survey crews.

Leaf Cleanup Is Underway

For details about Leaf Cleanup visit our Cleanup page.

The Street Division works as quickly and efficiently as possible to clean up leaves before the snow flies. There is not a schedule for Leaf Cleanup.

Road Closure

The steep dugway (600 East between 400 North and Canyon Road) will be closed September 16-26. The Logan City Street Department will be installing curb & gutter, storm drainage, and crosswalks to tie in the new trail.

2014 Chip & Seal

The 2014 Chip & Seal program will run from June 30th through August 1st. For more information on this program and to see which roads are scheduled to be completed, view the Chip & Seal page.

2014 Spring Cleanup

The 2014 Spring Cleanup of yard waste will begin on Monday, April 14, 2014. Specifics on the program can be found on the Streets Department page.

Annual Meeting for Contractors, Engineers, Architects, and Developers

Date: Monday, March 10, 2014
Time: 9:00 am - 11:00 am
Place: Logan City Hall Council Chambers
290 N 100 W, Logan, UT
City Representatives will be discussing:
  • Safety
  • Storm Water
  • Standards & Specifications
  • Design Standards
  • Permits
  • Address questions


Sponsored by: Logan, Providence, Hyrum, North Logan, Millville, Richmond, River Heights, and Hyde Park Cities


Logan City will require attendance to this meeting for land disturbance and work in the right-of-way permits.


Download Flyer

+ A A A