1200 NORTH 200 EAST to 600 EAST WATERLINE-STORM DRAIN-ROAD RECONSTRUCTION
To be included on the Plan Holder List, please send your name, company name, email address, and phone number to Lori Mathys.
1200 North 200 East to 600 East Waterline, Storm Drain, Road Reconstruction - Bid Docs
1200 North 200 East to 600 East Waterline, Storm Drain, Road Reconstruction - Drawings
1200 North 200 East to 600 East Waterline, Storm Drain, Road Reconstruction - Excel Bid Schedule
1200 North 200 East to 600 East Waterline, Storm Drain, Road Reconstruction - QA
1200 North 200 East to 600 East Waterline, Storm Drain, Road Reconstruction - Addendum 1
1200 North 200 East to 600 East Waterline, Storm Drain, Road Reconstruction - Excel Bid Schedule - Addendum 1
TABULATION
ADDITIONAL INFORMATION
1. Plan sets do not show any sidewalk or curb and gutter removal to facilitate replacement of water service lines. What was Logan City’s intent on how this was to be done and paid. Is the sidewalk and curb and gutter an incidental to this line item?
a. Logan City did not specify how each service line was to be replaced. Any trenching or concrete replacement necessary for new water service tie in should be treated as an incidental to that water service work. On previous projects Logan City has allowed the new service to be pulled through the ground by the old service to eliminate the need for digging a separate trench for each new service line. Logan City would allow this method of installation as long as it still meets all the criteria listed in the plan set and bid documents.