Building Inspections Required

share
After the fees have been paid and the permit is issued, you may begin construction.  Inspections are required to make sure the integrity of the structure is safe throughout the stages of construction.  IT IS THE PROJECT MANAGER'S RESPONSIBILITY TO SCHEDULE INSPECTIONS AT EACH STAGE OF CONSTRUCTION.  Failure to schedule inspections may lead to a stop-work order, withholding a certificate of occupancy, and future code compliance fines.

Click to view a detailed list of Residential Required Inspections.

Click to view a detailed list of Commercial Required Inspections.

A general list of required inspections:
  • Footings
  • Foundation
  • Below Grade Plumbing/Mechanical
  • Shear Wall
  • Rough 4-Way Inspection (including gas line pressure tests, interior framing, power-to-panel connection, weather barrier, mechanical rough, plumbing rough, and electrical rough)
  • Final Inspection

Once the final inspection has been approved and the necessary departments have signed off on your project, a certificate of occupancy will be issued.

To schedule an inspection, please call 435-716-9030.  Please note, 24-Hour notice is required for ALL inspections; inspection appointments are available Monday through Friday at 9:00-11:30, 1:00-3:00.